OEM manufacturer Removing Excavator Bucket Pins - Bucket pin for ecator P00C320 – XINGMAO
OEM manufacturer Removing Excavator Bucket Pins - Bucket pin for ecator P00C320 – XINGMAO Detail:
Supply Ability
20 thousand pcs/month
Export port:
Xiamen etc.
The raw materials
We strictly control the procurement of raw materials,Strict requirement for required steel must meet all property standards of 45# and 40Cr steel. Ensure quality at the source of production.
Roughing
Adopt double blanking of lathe, manual marking of production, multiple precision, running the material, ensure the follow-up production of material preparation on the premise of precision.
Drilling
To realize the normalization, standardization and conformity of drilling program data.
Heat Tempering treatment
In terms of product hardness, in order to guarantee product quality, there is no quality product with blasting lines or hidden cracks inside or outside. The hardness depth reaches 2-3mm, which makes it stronger and more durable.
Polishing
Manual supervision, measurement and adjustment are made for many times, so that the finished product can have a more refined appearance.
package
Pack detail:
Carton box fixed on plywood plallet
Pin size list
3090726 | Pin | ZX70, ZX70-3 |
3090725 | Pin | ZX70, ZX70-3 |
3089243 | Pin | ZX110, ZX120, ZX110-3, ZX120-3, ZX140W-3, ZX130-5G |
3089242 | Pin | ZX110, ZX120, ZX110-3, ZX120-3, ZX140W-3, ZX130-5G |
3089103 | Pin | ZX110, ZX120, ZX110-3, ZX120-3, ZX140W-3, ZX130-5G |
3088580 | Pin | ZX200, ZX200-3, ZX200-3G, ZX200-5G |
3088581 | Pin | ZX200, ZX200-3, ZX200-3G, ZX200-5G |
3088579 | Pin | ZX200, ZX200-3, ZX200-3G, ZX200-5G |
8102957 | Pin | ZX200, ZX200-3, ZX200-3G, ZX200-5G |
8081449 | Pin | ZX200, ZX200-3, ZX200-3G, ZX200-5G |
3088753 | Pin | ZX230, ZX240-3, ZX240-3G, ZX240-5G |
3088754 | Pin | ZX230, ZX240-3, ZX240-3G, ZX240-5G |
3038448 | Pin | ZX230, ZX240-3, ZX240-3G, ZX240-5G |
3088752 | Pin | ZX230, ZX240-3, ZX240-3G, ZX240-5G |
3090417 | Pin | ZX330, ZX330-3, ZX330-3G, ZX330-5G |
3090418 | Pin | ZX330, ZX330-3, ZX330-3G, ZX330-5G |
3092037 | Pin | ZX330, ZX330-3, ZX330-3G, ZX330-5G |
3089968 | Pin | ZX330, ZX330-3, ZX330-3G, ZX330-5G |
8092014 | Pin | ZX330, ZX330-3, ZX330-3G, ZX330-5G |
3079232 | Pin | ZX450, ZX450-3, ZX470-5G, EX400-5 |
3093215 | Pin | ZX450, ZX450-3, ZX470-5G, EX400-5 |
3060475 | Pin | ZX450, ZX450-3, ZX470-5G, EX400-5 |
3055219 | Pin | ZX450, ZX450-3, ZX470-5G, EX400-5 |
205-70-73270 | Pin | PC200-7, PC200-8, PC220-7,PC220-8 |
22U-70-21191 | Pin | PC200-7, PC200-8 |
20Y-70-31251 | Pin | PC200-7, PC200-8, PC220-7,PC220-8 |
205-70-71190 | Pin | PC200-7, PC200-8 |
205-70-65750 | Pin | PC240-7, PC270-7 |
206-70-53140 | Pin | PC220-7, PC220-8 |
206-70-55270 | Pin | PC220-7, PC220-8 |
206-70-51170 | Pin | PC220-7, PC220-8 |
207-70-73210 | Pin | PC300-7, PC300-8 |
207-70-33141 | Pin | PC300-7, PC300-8 |
207-70-31180 | Pin | PC300-7, PC300-8 |
207-70-71130 | Pin | PC300-7, PC300-8 |
207-70-32160 | Pin | PC300-7, PC300-8 |
208-70-61240 | Pin | PC300-7, PC300-8, PC400-7, PC400-8 |
207-70-31172 | Pin | PC300-7, PC300-8 |
208-70-73520 | Pin | PC400-7, PC400-8 |
208-70-73131 | Pin | PC400-7, PC400-8 |
208-70-71590 | Pin | PC400-7, PC400-8 |
208-70-61191 | Pin | PC400-7, PC400-8 |
AND SO ON..COTACT FOR MORE |
FAQ
1. What is your minimum order?
It depends on parts of you are buying.Normally.if take from stock,we can do box sample order… Full container and LCL container (less than a container load) can be acceptable
2. What is your delivery time?
FOB Xiamen or any Chinese port:25-30 days.lf order parts in stock, our delivery time can be short only 2-3 days.
3. How is the packaging of the goods?
Standard export packaging, boxes, pallets, or according to customer requirements.
Product detail pictures:

Related Product Guide:
We've one of the most innovative manufacturing devices, experienced and qualified engineers and workers, recognized good quality handle systems and also a friendly experienced income team pre/after-sales support for OEM manufacturer Removing Excavator Bucket Pins - Bucket pin for ecator P00C320 – XINGMAO , The product will supply to all over the world, such as: Rotterdam, Riyadh, America, Strong infrastructure is the need of any organization. We are backed with a robust infrastructural facility that enables us to manufacture, store, quality check and dispatch our products worldwide. To maintain smooth work flow, we have sectioned our infrastructure into a number of departments. All these departments are functional with latest tools, modernized machines and equipment. Owing to which, we are able to accomplish voluminous production without compromising upon the quality.

This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
